CONNECTED magazine n°6
?
學(xué)習(xí)與探索

連接民主——奧地利議會(huì)內(nèi)部
在帕拉斯·雅典娜的注視下,新古典主義的柱廊讓人聯(lián)想到古希臘的理想與哈布斯堡王朝的輝煌。然而,奧地利議會(huì)大廈不僅僅是一座歷史悠久的大理石建筑,更是現(xiàn)代民主的舞臺(tái)。

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

New Factory in Budapest Hungary
To increase LEMO's production capacities, a new factory has been built in Budapest-Hungary. The new factory has been running since November 2010 and has a total surface of 10'240 m2. It is the only LEMO Group factory that combines all the manufacturing processes within one site : injection molding, assembly and plating....